PV EXP 302: SOLAR PROJECT MANAGEMENT

Back to course category
Prerequisite:
- PV EXP 301 (COMPLETE PROJECT MANAGEMENT)
- LEARN THE USE OF SOFTWARE/PACKAGES BELOW
- Google Earth – aerial mapping software
- Auto Cad for Solar
- PV Sol Premium
- PV Syst
- MS Project (from PV EXP 301)
Course Content:
Complete End to End Service from Preliminary Design through to Installation and After Care.
A. Preliminary Design
- There is need to be proficient with use the following Software Packages for use in the Initial System Design
- Google Earth – aerial mapping software
- Auto Cad
- PV Sol Premium
- PV Syst
- MS Project (from PV EXP 301)
- Initial system Design with the appropriate software package (from above)
- Get all necessary information on site details. (GPS coordinates, Shading etc)
- Initial consultation with Client to get electricity usage (Load) data for 12 months on Client premises
- Identifying premises on aerial mapping software e.g (Google Earth)
- Creating an indicative outline drawing fitting the brief received- (PV Sol)
- calculating expected generation and consumption (PV Syst)
- calculating costs working within your budget. (MS Project)
- Energy surveys and audits,
B. Initial Commercial Proposal to Client for Approval
Upon Approval by Client:
C. Final System Design
D. PROCUREMENT
Procurement must be done with following Objectives in mind:
- delivering sustainability without compromise in the following ways:
- Survey of Trusted brands
- Estimating projects needs and budget at the forefront of product proposals
- Competitive prices
- Best and most suitable solar PV products selected for client’s project
- Survey of Top World Class Suppliers. & Direct supply chain
- specification of the correct products,
E. INSTALLATION
Use dedicated Solar PV installation Expert team for Installation.
Ensure your Strength includes
- Skilled, experienced and fully qualified installers with up-to-date Health & Safety training
- Knowledge and understanding based on Global Installation around the world
- Limited disruption, working at times to suit you to minimise disruption and downtime
- Work to a rigorous behaviour bond which is shared with all customers prior to each installation
- Building Controls Installation
- Supply Return on Investment Costing Table that clearly highlights your annual cost and energy savings and payback periods
- Total energy consumption measured and highlighted against each of your existing energy sources at an additional cost
- Calculation of your existing carbon footprint and energy cost per year for specific projects
- Calculation of your revised annual carbon footprint and energy cost (based on a series of agreed assumptions) for specific projects
- Calculation of your return-on-investment year by year to clearly demonstrate the financial benefits of choosing Solar energy solutions
F. Commissioning & handing over to Client Procedure includes
- Verifying that the design meets the owner’s project requirements
- Verifying that applicable equipment and systems are installed according to the contract documents, manufacturer’s recommendations, and industry accepted minimum standards
- Verifying installing contractors perform adequate operations checkout
- Verifying/documenting proper performance of equipment and systems
- Verifying that the operations and maintenance documentation left on-site is complete
- Verifying the owner’s operating personnel are adequately trained
G. Monitoring/Maintenance – On-going Support
organise on-going support after delivery of the Solar PV project in various ways by:
- Remote Monitoring
- Operation and Maintenance Contracts, e.g., Landscaping, Model Cleaning and Diagnostics
- Replacement of faulty equipment and supply of spares
- Dedicated response team.